Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
pattern
1. Bidding calculation (HVAC power cable maintenance). Measuring distance area and volume
2. Measuring the height or width of buildings and other objects. Trigonometry may be used if necessary.
3. Accounting of Buildings and Design Circumferences Built by CAD
4. Determine whether the sides of a room or object are really straight or completely parallel
5. Parking lot pattern
6. Check whether the new building meets the operational requirements
7. The occupancy of equipment or office compartments. Help to arrange the layout of power and utility.
8. Determine the dimensions of the built buildings without drawing low.
9. Calculating the internal area of a room or building
Fire safety
1. Measure the installation distance of emergency lamp and sprinkler fire extinguisher (including ceiling height).
2. Determine the size of the room accurately to determine the chemical concentration of the cleaning body fire extinguishing system.
3. Measure the distance between the fire fighting equipment (fire extinguishers, blankets, etc.) and the machine.
4. Measure the water level in the fire extinguishing tank.
December 28, 2023
December 15, 2023
อีเมล์ให้ผู้ขายนี้
December 28, 2023
December 15, 2023
October 31, 2019
August 09, 2019
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.